Method for determining the integrated value of a construction project
dc.contributor.author | Nakhimi, M. | |
dc.contributor.author | Savina, O. | |
dc.contributor.author | Haidaienko, O. | |
dc.contributor.author | Bielova, O. | |
dc.date.accessioned | 2021-10-05T12:17:40Z | |
dc.date.available | 2021-10-05T12:17:40Z | |
dc.date.issued | 2021 | |
dc.description | Method for determining the integrated value of a construction project / M. Nakhimi, O. Savina, O. Haidaienko, O. Bielova // The scientific heritage. – 2021. – № 61 (61), Vol. 1. – P. 63–71. | uk_UA |
dc.description.abstract1 | This work is devoted to the peculiarities of using an integrated approach in the management of construction projects. It was shown that the integrated approach is used as a combination of the value approach with the management of the content of construction projects into a single integrated process. The processes of operation of these two control methods are considered and a simplified diagram of possible interaction is built. A simpler way of constructing a diagram for integration of value content management of construction projects was presented as a factor in establishing a clear connection to achieve project goals, in this case, time, value (costs) and content (resources). | uk_UA |
dc.description.provenance | Submitted by Диндеренко Катерина (kateryna.dynderenko@nuos.edu.ua) on 2021-10-05T12:17:40Z No. of bitstreams: 1 Nakhimi.pdf: 1847921 bytes, checksum: 5a2141bbd9d25055f8b71ca787e832b3 (MD5) | en |
dc.description.provenance | Made available in DSpace on 2021-10-05T12:17:40Z (GMT). No. of bitstreams: 1 Nakhimi.pdf: 1847921 bytes, checksum: 5a2141bbd9d25055f8b71ca787e832b3 (MD5) | en |
dc.identifier.issn | 9215-0365 | |
dc.identifier.uri | https://eir.nuos.edu.ua/handle/123456789/4465 | |
dc.language.iso | en | uk_UA |
dc.subject | project content management | uk_UA |
dc.subject | project management | uk_UA |
dc.subject | construction project management | uk_UA |
dc.subject | WBS | uk_UA |
dc.subject | construction projects | uk_UA |
dc.title | Method for determining the integrated value of a construction project | uk_UA |
dc.title2 | 2021 | |
dc.type | Article | uk_UA |
Файли
Контейнер файлів
1 - 1 з 1
Вантажиться...
- Назва:
- Nakhimi.pdf
- Розмір:
- 1.76 MB
- Формат:
- Adobe Portable Document Format
- Опис:
- стаття
Ліцензійна угода
1 - 1 з 1
Ескіз недоступний
- Назва:
- license.txt
- Розмір:
- 7.05 KB
- Формат:
- Item-specific license agreed upon to submission
- Опис: